Concrete pool
from$62,000
Sprayed concrete over a steel frame, built to the size and outline drawn for your garden, finished in tile or a smooth render.
- Any length, depth or curve
- Steps, ledges and a shallow beach entry
- Lasts for decades with care

Bluecrest designs and builds concrete and fibreglass pools for private gardens. Every project starts with a survey of the ground and the way in, so your price is based on your garden, and every stage has a date you agree before the digger arrives.
Starting prices for a level garden with room for a small digger. Rock, high groundwater, a long carry for the soil or a steep slope change the figure, which is why the survey comes first.
from$62,000
Sprayed concrete over a steel frame, built to the size and outline drawn for your garden, finished in tile or a smooth render.
from$41,000
A one piece shell made in a factory mould, set into a prepared hole on a bed of crushed stone and backfilled around the sides.
from$29,000
A short, deep pool for cooling off or swimming against a current, in concrete or fibreglass, for courtyards and narrow plots.
Prices cover design, digging, the shell, standard filtration, coping and a temporary fence during the build. Permanent barriers, heating, covers and landscaping are priced at the survey.
Each stage ends with a check you are welcome to attend. Payments follow the stages and never run ahead of them.
We walk the garden, test the soil, measure the way in and draw the pool with you, then send a written quote.
We explain which approvals usually apply where you live, prepare the drawings and wait for your go ahead.
The site is fenced, the hole dug and the soil carried away, then the steel cage or the stone bed goes in.
Concrete is sprayed or the fibreglass shell is set, and pipes run to the equipment housing.
Coping, tiles, paving and the permanent safety barrier are fitted around the water.
We fill and balance the water, run the equipment with you and hand over the manuals and the care sheet.
Typical time on site once approvals are in place. Weather, rock and late deliveries can add weeks, and we tell you the day a date moves.
| Stage | Concrete pool | Fibreglass pool | What can push it back |
|---|---|---|---|
| Survey to written quote | 2 to 3 weeks | 2 to 3 weeks | Soil tests, drawings for unusual outlines |
| Approvals | Varies by place | Varies by place | Local rules, neighbour consultation, a busy office |
| Dig and frame | 1 to 2 weeks | 3 to 5 days | Rock, groundwater, a long carry for the soil |
| Shell and pipes | 2 to 3 weeks plus curing | About 1 week | Rain on spray days, the delivery slot for the shell |
| Coping, tiles and barrier | 3 to 5 weeks | 2 to 3 weeks | Stone deliveries, the tile you choose, frost |
| Fill and handover | About 1 week | About 1 week | Low water pressure in the street |
Concrete has to cure before it is tiled, so a concrete pool has quiet weeks in the middle when nobody is on site. That is normal, and your plan shows them.

A pool is a drowning risk for young children and pets from the day the hole is dug. We fence the site through the build and fit the permanent barrier before the pool is filled, never after.
Rules on barrier height, gates and alarms differ from country to country and often between councils, so we check what applies to your address and build to it. Your local authority has the final word.
Chosen at the survey or added later. We fit only equipment our own crew can service.
Sized to the volume of the pool and the length of season you want, with the unit placed away from bedroom windows.
A slatted or solid cover on a track that closes the whole pool off, opened and shut with a key switch.
Low voltage lights set into the walls while the shell is built, on a timer in the equipment housing.
Larger filters, a variable speed pump or a salt cell, chosen for the number of swimmers you expect.
Stone or porcelain coping and a paved surround laid to fall away from the water.
Monthly visits through the swimming season, plus the spring opening and autumn closing, by the crew who built it.
Care plans begin after handover and can be stopped with a month's notice.
Photos from this year's builds, from the first bucket of soil to the evening we handed over the controls.






The survey found clay two spades down, and they changed the plan before anything was signed. The pool went in a fortnight later than first drawn, but every date after that was kept.
Our side passage was too narrow for a normal digger, so they brought a smaller one and a conveyor for the soil. The fence went up on day one, which mattered with toddlers next door.
Handover took a whole afternoon: the filter, the heat pump and how to test the water. The same crew came back in spring to open it up again.
Often, and the answer turns on your address. In some places a garden pool counts as permitted work, while others ask for planning approval, a building permit or both, and barrier rules apply almost everywhere. We explain what usually applies at the survey and prepare the drawings, and the decision rests with your local authority.
Concrete suits unusual outlines, long lap lanes and awkward slopes. Fibreglass needs fewer weeks on site and feels very smooth underfoot, but the shell travels by road and is lifted in, so access and the sizes of the moulds decide a lot. The survey usually makes the choice clear.
A typical pool fills several lorries. We price the removal at the survey, and some clients keep part of it to level the lawn or build up a raised bed.
Expect a working area around the pool and a route from the gate to it for the whole build. Lawn along that route usually needs reseeding, which is part of the finishes stage.
A deposit when you sign, then one payment at the end of each stage once you have seen it. The last payment falls due at handover, after the water is balanced and the equipment is running.
You get the manuals, a water care sheet and a first visit four weeks later. The monthly care plan is optional and stops with a month's notice.
Describe the garden and the pool you picture. Within two working days we call to fix a visit of about ninety minutes, and the written quote follows within three weeks.
The office plans surveys and stage dates. Once your build starts, the crew lead gives you a direct number as well.
| Monday to Friday | 08:00 to 17:30 |
| Saturday | 09:00 to 13:00, surveys only |
| Sunday | Closed |
Private gardens within about 90 minutes of our yard. Further away, we can still survey, and the travel cost is listed on its own before you agree to anything.
This pool builder website was built by AI from two sentences. Tell us about your business and yours is built the same way, with its pages, photos and booking in place, ready to preview in minutes.
About this sample page
Bluecrest Pool Builders exists only on this page, which shows how a pool builder can present a project that lasts for months. The opening view puts a survey button and a phone number over a finished pool, with typical weeks on site for each pool type. Three pool types follow with starting prices and the conditions that raise them. Six stages, a timescale table and a section on safety barriers answer the questions families ask before they let a digger into the garden. Extras, stage photos, example reviews, questions and a survey form complete the page.
On AI Web Maker, a pool firm starts by describing its pools, stages and travel area in a few sentences, and the draft that comes back includes an enquiry form. Survey requests then land through that form, while deposits and stage payments stay a matter for the firm and the family. Once live, the page costs $119 in hosting each year, or $19 in any month, the domain is a separate line, and drafting it brings no charge. A real firm should replace the stage photos with its own builds and the timescales with its own records. The order of survey, stages, timing and safety is worth keeping as it is.