From bare walls to the last bead of silicone
Level Line fits the bathroom you have chosen. The old suite comes out, pipes move, shower walls are boarded and tanked, tiles go up from a laser line and every joint is sealed. One fitter leads your job from the first morning to the handover, at a price fixed after a survey of the room.

Labour prices for the jobs we fit most
These are starting prices for labour, waste removal and fitting materials such as adhesive, grout, boards and membrane. Your suite, taps and tiles are bought by you, or sourced by us with the supplier's receipt passed on at cost. The real figure is fixed in writing after we have seen the room.
| Job | What it covers | Usual time | Labour from |
|---|---|---|---|
| Full suite refit | Bath or shower, basin, toilet and taps replaced, walls tiled around the wet areas, in a room up to 6 m² | 5 to 7 days | $4,200 |
| Bath out, shower in | Bath removed, low tray or tiled floor laid, glass screen, valve and tiling around the new shower | 3 to 4 days | $2,400 |
| En suite or cloakroom | Shower or basin and toilet in a small room, tiled from floor to ceiling | 4 to 5 days | $3,100 |
| Wet room | Floor built to a fall, walls and floor tanked, linear or square drain, full tiling | 7 to 9 days | $5,600 |
| Tiling on its own | Walls or floor tiled on a sound surface, with trims, grout and sealing | By the room | $48 per m² |
| Toilet or basin swap | Like for like change on the existing pipes, with the old one taken away | Half a day | $240 |
Prices are illustrative. Moving a soil pipe, raising a floor or replacing rotten boards is priced separately once it has been seen.
What every fitting price includes
A quote that lists everything is the only kind worth comparing. Each of ours names these items, so you know exactly what the figure buys.
- Survey and written quote
- Water and power isolated
- Floors and stairs protected
- Old suite and tiles taken out
- Waste taken away and recycled
- Pipes moved where the plan needs
- Shower walls boarded and tanked
- Tiles set out from a level line
- Leak checks before handover
- Silicone on every wet joint
- Making good around the room
- Room cleaned at the end
Left out unless the quote says otherwise: plastering beyond the bathroom, decorating, new electrical circuits and anything hidden behind walls or under floors. If we open a wall and find rot or an old leak, work stops, we show you, and the repair is priced before anything carries on.
How a fitting week runs
Every job follows the same order, because each stage has to be right before the next one covers it.
Day 1: strip out
Water and power to the room are isolated, the floor and stairs are covered, and the old suite, tiles and boards go out to the van for disposal.
Day 2: first fix
Wastes and supplies are moved to the new positions while the walls are open, then pressure tested before anything is boarded over.
Days 3 and 4: boards and tanking
Shower walls get water resistant board, then a tanking membrane with tape pressed into every corner and around every pipe.
Days 4 to 6: tiling
Tiles are set out from a laser line so the cut pieces match at both ends of the wall, then grouted and cleaned.
Last day: second fix and seal
Suite, taps and screen go in, the water goes back on, every joint is checked for drips and sealed, and the room is cleaned.

Water off, power safe, and the old suite gone the same day
Before a single tile comes off, we find the stop valve and the isolation valves, shut off the supply to the bathroom and check it is dry. Lights, shaver points and extractor fans on the bathroom circuit are switched off at the board and tested dead. Other rooms keep their water wherever the pipes allow, and the toilet is reconnected each evening when it is your only one.
The old bath, basin and boards leave with us on the first day, sorted for recycling where the local tip takes them, so nothing sits on your drive. Rules on electrics near water, extractor fans and moving drains differ between countries and often between regions. Any electrical work is carried out by a qualified electrician, gas work by a registered engineer, and we tell you at the survey if the job needs an approval where you live.
- Supply isolated and checked dry
- Bathroom circuit tested dead
- Waste removed on day one
- Making good around frames and ceilings
Rooms we handed back recently
Suites chosen by the owners, fitted and finished by us.






Asked while the old bath is still in
Why does the price wait for a survey?
Two rooms of the same size can hide very different problems: a soft floor under the bath, a soil pipe in the wrong place or walls that will not take tiles. Seeing them first means the written price holds, and the survey costs nothing extra if you go ahead with us.
Will the toilet work in the evenings?
In most homes, yes. If it is your only toilet, we reconnect it at the end of each day except during the hours the floor is being tiled, and we agree that timing with you before the job starts.
Can new tiles go over the old ones?
Rarely in a shower, because the old tiles hide whatever is behind them and add weight the wall may not hold. Outside wet areas, sound and firmly fixed tiles can sometimes be tiled over, and the survey tells you which applies.
What happens if you find damage under the floor?
We stop, take photos, show you the problem and price the repair in writing. Nothing extra is done without your agreement, and most repairs add a day rather than a week.
Do you supply the suite?
You can buy it yourself or ask us to source it. When we source it, the supplier's receipt is passed on at the price we paid, and we check every box on delivery before the strip out day.
How long is the fitting covered?
Our workmanship is covered for two years from the handover, including the tanking and the seals. The products themselves carry whatever guarantee their maker gives, and we pass that paperwork on with the keys to the room.
Said at the handover (example reviews)
The fitter found a slow drip under the old bath on the first morning and showed us before touching anything else. The new shower went in on time and the tile lines run dead straight across the window wall.
We bought the suite online and worried about missing parts. Every box was opened and checked before the old room came out, so the week ran without a single wasted day.
Our only toilet worked every evening, the stairs were covered all week and the skip never appeared because the old bath left in the van.
Book a survey of the room
Tell us what is coming out and what is going in. A survey time comes back to you inside one working day, usually for later that week, and the written quote follows within two days of the visit.
- Fixed price after the survey
- One fitter from start to handover
- Two years on our workmanship
Talk to the fitting office
Calls are answered on weekdays, and a message left after hours gets a call back before nine on the next weekday.
Phone, email and patch
Bathrooms fitted in the city and in villages up to 25 km out
When the phones are on
| Monday to Friday | 07:30 to 17:00 |
| Saturday, surveys only | 09:00 to 13:00 |
| Sunday | Closed |
Already have a quote?
Send us the list of what it includes and we will tell you honestly whether our price covers the same work, item by item.
Book a survey